|
|

预览图 |
|
| 基本信息 |
| 文件大小 |
42.41K |
文件格式 |
(rar) |
| 上传作者 |
中国投标网 |
责任编辑 |
deng |
| 上传时间 |
2008-5-14 |
点击次数 |
146人次 |
| 所属分类 |
普通施组 -> 其它 |
|
| 价格信息 |
|
|
|
The overall plot plan shall be designed according to the demands of construction arrangement, construction methods and construction schedule, while meeting the requirement of construction, living and onsite management The overall plot plan shall be synthetically arranged according to on-site landform, permanent establishment, transportation road and construction sequence. The arrangement shall be compact, reasonable and land-saving. The stipulations on security, fire-prevention, explosion prevention and environmental protection shall be observed. The temporary establishment shall not affect the construction of permanent engineering.
|
|